Home / Power plants / California / KDC Solar Madera LLC

KDC Solar Madera LLC

Solar power plant · Madera County, California

Nameplate capacity
10 MW
Rank in California
#845
of 1,897 plants
In service since
2023
December 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
TRITEC Americas
County
Madera County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in California
#285 of 937
EIA plant code
68038

Generating units

Individual generating units at KDC Solar Madera LLC
UnitTechnologyNameplateSummerOnlineStatus
VSPRCSolar Photovoltaic10 MW10 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Henrietta D Energy Storage LLCBattery storage10 MW
Jones ForkHydro10 MW
Kearny North Energy StorageBattery storage10 MW
Kearny South Energy StorageBattery storage10 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 10 MW solar plant and a 10 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates