Harris Farms Solar Facility
Solar power plant · Fresno County, California
Nameplate capacity
1.3 MW
Rank in California
#1653
of 1,897 plants
In service since
2024
March 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Harris Farms Inc
- County
- Fresno County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among solar plants in California
- #775 of 937
- EIA plant code
- 67868
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| HF1 | Solar Photovoltaic | 1.3 MW | 1.3 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Forever 21 Retail, Inc. | Solar | 1.3 MW |
| Golden Springs Building D | Solar | 1.3 MW |
| Life Technologies - Fremont | Natural gas | 1.3 MW |
| Pivot Energy PPA 22 | Solar | 1.3 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.3 MW solar plant and a 1.3 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates