Abel Road Bioenergy
Other power plant · Colusa County, California
Nameplate capacity
4.0 MW
Rank in California
#1094
of 1,897 plants
In service since
2022
July 2022
Details
- Primary fuel
- Other
- Technology
- Other Waste Biomass
- Operator
- ACC Renewable Resources
- County
- Colusa County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among other plants in California
- #103 of 152
- EIA plant code
- 65517
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| BMORC | Other Waste Biomass | 4.0 MW | 3.0 MW | 2022 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| RCWD PV Project | Solar | 4.1 MW |
| Valley View | Hydro | 4.1 MW |
| Apple Campus 2 Fuel Cell | Other | 4.0 MW |
| Arrache 8083 | Solar | 4.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.0 MW solar plant and a 4.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates