Solar power plant · Butte County, California

Nameplate capacity
2.5 MW
Rank in California
#1312
of 1,897 plants
In service since
2013
April 2013

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Altus Power America Management, LLC
County
Butte County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in California
#527 of 937
EIA plant code
58371

Generating units

Individual generating units at Gridley Main Two
UnitTechnologyNameplateSummerOnlineStatus
GEN1Solar Photovoltaic2.5 MW2.5 MW2013Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

Colton Solar One, LLCSolar2.5 MW
GEN005 Antibody Fuel CellNatural gas2.5 MW
IGS SBD2Solar2.5 MW
North Kern 1Solar2.5 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.5 MW solar plant and a 2.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates