Solar power plant · Kern County, California

Nameplate capacity
1.5 MW
Rank in California
#1524
of 1,897 plants
In service since
2016
April 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
ZGlobal Inc
County
Kern County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in California
#672 of 937
EIA plant code
60277

Generating units

Individual generating units at Castor Solar
UnitTechnologyNameplateSummerOnlineStatus
CASTRSolar Photovoltaic1.5 MW1.5 MW2016Out of service but expected to return to service in next calendar year

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.5 MW solar plant and a 1.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates