Home / Power plants / California / Rosamond South 1

Rosamond South 1

Solar power plant · Kern County, California

Nameplate capacity
257 MW
Rank in California
#94
of 1,897 plants
In service since
2025
August 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Golden Fields Solar IV, LLC
County
Kern County
Generating units
2
Share of state capacity
0.24%
Rank among solar plants in California
#32 of 937
EIA plant code
67764

Generating units

Individual generating units at Rosamond South 1
UnitTechnologyNameplateSummerOnlineStatus
RS1Solar Photovoltaic140 MW140 MW2025Operating
RBESSBatteries117 MW117 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in California

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 257 MW solar plant and a 257 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates