Genesis Solar Energy Project
Solar power plant · Riverside County, California
Nameplate capacity
250 MW
Rank in California
#103
of 1,897 plants
In service since
2013
November 2013
Details
- Primary fuel
- Solar
- Technology
- Solar Thermal without Energy Storage
- Operator
- Genesis Solar LLC
- County
- Riverside County
- Generating units
- 2
- Share of state capacity
- 0.23%
- Rank among solar plants in California
- #38 of 937
- EIA plant code
- 57394
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GEN01 | Solar Thermal without Energy Storage | 125 MW | 125 MW | 2014 | Operating |
| GEN02 | Solar Thermal without Energy Storage | 125 MW | 125 MW | 2013 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in California
| Athos Solar Project | Solar | 250 MW |
| Gateway Energy Storage System | Battery storage | 250 MW |
| Victory Pass | Solar | 250 MW |
| California Valley Solar Ranch | Solar | 250 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 250 MW solar plant and a 250 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All California power plants · What California actually generates