West of the Pecos Solar
Solar power plant · Reeves County, Texas
Nameplate capacity
100 MW
Rank in Texas
#554
of 1,071 plants
In service since
2019
December 2019
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- RWE Clean Energy
- County
- Reeves County
- Generating units
- 1
- Share of state capacity
- 0.05%
- Rank among solar plants in Texas
- #139 of 238
- EIA plant code
- 62415
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| WOTP1 | Solar Photovoltaic | 100 MW | 100 MW | 2019 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Tres Port Power, LLC | Natural gas | 100 MW |
| Victoria Port II | Natural gas | 100 MW |
| Anacacho Wind Farm, LLC | Wind | 100 MW |
| Blue Summit II Wind | Wind | 99 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 100 MW solar plant and a 100 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates