TX Houston 7080 Express Lane
Solar power plant · Harris County, Texas
Nameplate capacity
1.9 MW
Rank in Texas
#923
of 1,071 plants
In service since
2025
February 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Catalyze Houston Express Lane Microgrid, LLC
- County
- Harris County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among solar plants in Texas
- #222 of 238
- EIA plant code
- 66517
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 19344 | Solar Photovoltaic | 1.9 MW | 1.9 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| GVEC | Solar | 2.0 MW |
| TX Sunnyvale 367 Long Creek Road Solar | Solar | 2.0 MW |
| ABIA Parking Structure | Solar | 1.8 MW |
| Jameson Gas Processing Plant | Natural gas | 1.8 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.9 MW solar plant and a 1.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates