Home / Power plants / Texas / Lumina II Solar Project

Lumina II Solar Project

Solar power plant · Scurry County, Texas

Nameplate capacity
487 MW
Rank in Texas
#101
of 1,071 plants
In service since
2024
January 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
County
Scurry County
Generating units
2
Share of state capacity
0.24%
Rank among solar plants in Texas
#8 of 238
EIA plant code
65644

Generating units

Individual generating units at Lumina II Solar Project
UnitTechnologyNameplateSummerOnlineStatus
LUMIISolar Photovoltaic327 MW320 MW2024Operating
LU2BABatteries160 MW160 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Oyster Creek Unit VIIINatural gas498 MW
Maverick Creek WindWind492 MW
Lumina Solar ProjectSolar487 MW
Braes Bayou PlantNatural gas484 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 487 MW solar plant and a 487 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates