OCI Alamo 2, LLC
Solar power plant · Bexar County, Texas
Nameplate capacity
4.4 MW
Rank in Texas
#892
of 1,071 plants
In service since
2014
March 2014
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- OCI Energy LLC
- County
- Bexar County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among solar plants in Texas
- #210 of 238
- EIA plant code
- 58716
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | 4.4 MW | 4.4 MW | 2014 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| BESSP1, LLC. | Solar | 4.4 MW |
| Nelson Gardens Landfill Gas to Energy | Other | 4.4 MW |
| Ameresco Dallas LLC | Other | 4.2 MW |
| Tenet Hospital | Natural gas | 4.2 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.4 MW solar plant and a 4.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates