Home / Power plants / Texas / East Blackland Solar Project 1

East Blackland Solar Project 1

Solar power plant · Travis County, Texas

Nameplate capacity
144 MW
Rank in Texas
#454
of 1,071 plants
In service since
2021
July 2021

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Duke Energy Renewables Services
County
Travis County
Generating units
1
Share of state capacity
0.07%
Rank among solar plants in Texas
#108 of 238
EIA plant code
57659

Generating units

Individual generating units at East Blackland Solar Project 1
UnitTechnologyNameplateSummerOnlineStatus
PSFSolar Photovoltaic144 MW144 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Swift Air Solar ISolar145 MW
Palmas Wind, LLCWind145 MW
Panther Creek Wind Farm IWind143 MW
Silas RayNatural gas143 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 144 MW solar plant and a 144 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates