Home / Power plants / Texas / Parliament Solar

Parliament Solar

Solar power plant · Waller County, Texas

Nameplate capacity
480 MW
Rank in Texas
#109
of 1,071 plants
In service since
2025
June 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Parliament Solar, LLC
County
Waller County
Generating units
2
Share of state capacity
0.24%
Rank among solar plants in Texas
#11 of 238
EIA plant code
69320

Generating units

Individual generating units at Parliament Solar
UnitTechnologyNameplateSummerOnlineStatus
PAR1Solar Photovoltaic241 MW241 MW2025Operating
PAR2Solar Photovoltaic239 MW239 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Remy Jade Power StationNatural gas484 MW
IP Radian, LLCSolar480 MW
Hale Community Wind FarmWind478 MW
NicholsNatural gas475 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 480 MW solar plant and a 480 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates