Nameplate capacity
7.5 MW
Rank in Texas
#858
of 1,071 plants
In service since
1970
January 1970
Details
- Primary fuel
- Other
- Technology
- All Other
- Operator
- Eco Services Corp.
- County
- Harris County
- Generating units
- 2
- Share of state capacity
- 0.00%
- Rank among other plants in Texas
- #32 of 47
- EIA plant code
- 52065
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GEN1 | All Other | 6.0 MW | 5.5 MW | 1977 | Operating |
| GEN2 | All Other | 1.5 MW | 1.5 MW | 1970 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Toyota HQ Plan | Solar | 7.7 MW |
| Seadrift Coke LP | Other | 7.6 MW |
| Lampwick | Solar | 7.5 MW |
| Talco Solar Project | Solar | 7.5 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 7.5 MW solar plant and a 7.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates