Nameplate capacity
50 MW
Rank in Texas
#633
of 1,071 plants
In service since
2009
September 2009
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Diamond Shamrock Refining Company LP
- County
- Moore County
- Generating units
- 1
- Share of state capacity
- 0.02%
- Rank among wind plants in Texas
- #212 of 228
- EIA plant code
- 57326
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| WND1 | Onshore Wind Turbine | 50 MW | 50 MW | 2009 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Woodville Renewable Power Project | Other | 50 MW |
| Pitts Dudik Solar | Solar | 50 MW |
| USG Paper, LLC - Orange Mill | Other | 48 MW |
| Central Utility Plant - Texas A&M | Natural gas | 45 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates