Liberty Hybrid Solar and Storage Project
Solar power plant · Harris County, Texas
Nameplate capacity
132 MW
Rank in Texas
#465
of 1,071 plants
In service since
2025
July 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Liberty 1 Solar LLC
- County
- Harris County
- Generating units
- 2
- Share of state capacity
- 0.07%
- Rank among solar plants in Texas
- #113 of 238
- EIA plant code
- 67867
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| LIB1 | Solar Photovoltaic | 67 MW | 67 MW | 2025 | Operating |
| LIB2 | Batteries | 65 MW | 65 MW | 2026 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Elm Branch Solar 1 | Solar | 135 MW |
| Elara Solar | Solar | 132 MW |
| Sherbino II | Wind | 132 MW |
| Orange Grove | Solar | 131 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 132 MW solar plant and a 132 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates