Headcamp BESS

Battery storage power plant · Pecos County, Texas

Nameplate capacity
150 MW
Rank in Texas
#442
of 1,095 plants
In service since
2026
June 2026

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Lydian Energy
County
Pecos County
Generating units
1
Share of state capacity
0.07%
Rank among battery storage plants in Texas
#43 of 226
EIA plant code
68580

Generating units

Individual generating units at Headcamp BESS
UnitTechnologyNameplateSummerOnlineStatus
MHBBatteries150 MW150 MW2026Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 150 MW solar plant and a 150 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates