Cutlass Solar II
Solar power plant · Fort Bend County, Texas
Nameplate capacity
203 MW
Rank in Texas
#292
of 1,071 plants
In service since
2024
July 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Cutlass II Solar LLC
- County
- Fort Bend County
- Generating units
- 1
- Share of state capacity
- 0.10%
- Rank among solar plants in Texas
- #67 of 238
- EIA plant code
- 66262
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| SAREN | Solar Photovoltaic | 203 MW | 200 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Crossett Power Management LLC | Battery storage | 203 MW |
| Magic Valley Wind Farm I LLC | Wind | 203 MW |
| Lane City Wind | Wind | 203 MW |
| Montgomery Ranch Wind Farm, LLC | Wind | 203 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 203 MW solar plant and a 203 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates