Home / Power plants / Texas / Sequoia 1

Sequoia 1

Solar power plant · Eastland County, Texas

Nameplate capacity
401 MW
Rank in Texas
#131
of 1,071 plants
In service since
2025
December 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Sequoia 1 Solar Project
County
Eastland County
Generating units
1
Share of state capacity
0.20%
Rank among solar plants in Texas
#18 of 238
EIA plant code
68200

Generating units

Individual generating units at Sequoia 1
UnitTechnologyNameplateSummerOnlineStatus
SEQ1Solar Photovoltaic401 MW401 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Ash Creek SolarSolar409 MW
Bright Arrow Solar, LLCSolar404 MW
Noble SolarSolar400 MW
Waco SolarSolar400 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 401 MW solar plant and a 401 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates