TPE Whitney Solar, LLC
Solar power plant · Bosque County, Texas
Nameplate capacity
9.9 MW
Rank in Texas
#826
of 1,071 plants
In service since
2017
December 2017
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Cardinal Renewables
- County
- Bosque County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among solar plants in Texas
- #191 of 238
- EIA plant code
- 63180
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| TXWHT | Solar Photovoltaic | 9.9 MW | 9.9 MW | 2017 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Swoose I | Battery storage | 9.9 MW |
| TPE Erath Solar, LLC | Solar | 9.9 MW |
| TX2 Port Lavaca | Battery storage | 9.9 MW |
| TX7 Flat Top | Battery storage | 9.9 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 9.9 MW solar plant and a 9.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates