TX15 Limousin Oak Storage
Battery storage power plant · Grimes County, Texas
Nameplate capacity
100 MW
Rank in Texas
#549
of 1,071 plants
In service since
2024
August 2024
Details
- Primary fuel
- Battery storage
- Technology
- Batteries
- Operator
- Key Capture Energy
- County
- Grimes County
- Generating units
- 1
- Share of state capacity
- 0.05%
- Rank among battery storage plants in Texas
- #72 of 211
- EIA plant code
- 65698
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| TX15 | Batteries | 100 MW | 100 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| TX10 Hummingbird Storage | Battery storage | 100 MW |
| TX12 Silicon Hill Storage | Battery storage | 100 MW |
| Tierra Seca | Battery storage | 100 MW |
| Tres City Power LLC | Natural gas | 100 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 100 MW solar plant and a 100 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates