Castle Gap Solar Hybrid

Solar power plant · Upton County, Texas

Nameplate capacity
190 MW
Rank in Texas
#358
of 1,071 plants
In service since
2018
May 2018

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Upton County Solar 2 LLC
County
Upton County
Generating units
2
Share of state capacity
0.09%
Rank among solar plants in Texas
#89 of 238
EIA plant code
60123

Generating units

Individual generating units at Castle Gap Solar Hybrid
UnitTechnologyNameplateSummerOnlineStatus
CGAPSolar Photovoltaic180 MW180 MW2018Operating
BAT1Batteries9.9 MW9.9 MW2019Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Plant XNatural gas190 MW
Cunningham StorageBattery storage190 MW
Notrees Windpower HybridWind189 MW
Baffin WindWind188 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 190 MW solar plant and a 190 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates