Western Trail Wind, LLC
Wind power plant · Wilbarger County, Texas
Nameplate capacity
367 MW
Rank in Texas
#140
of 1,071 plants
In service since
2022
April 2022
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Orsted Onshore North America
- County
- Wilbarger County
- Generating units
- 1
- Share of state capacity
- 0.18%
- Rank among wind plants in Texas
- #13 of 228
- EIA plant code
- 64149
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| WTW | Onshore Wind Turbine | 367 MW | 367 MW | 2022 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Stephens Ranch Wind Energy LLC | Wind | 376 MW |
| Timmerman Power Plant | Natural gas | 368 MW |
| Red Tailed Hawk Solar LLC | Solar | 360 MW |
| Ector County Energy Center | Natural gas | 359 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 367 MW solar plant and a 367 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates