Home / Power plants / Texas / Reloj del Sol Wind Farm

Reloj del Sol Wind Farm

Wind power plant · Zapata County, Texas

Nameplate capacity
209 MW
Rank in Texas
#277
of 1,071 plants
In service since
2021
May 2021

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Reloj del Sol Wind Farm LLC
County
Zapata County
Generating units
1
Share of state capacity
0.10%
Rank among wind plants in Texas
#74 of 228
EIA plant code
62207

Generating units

Individual generating units at Reloj del Sol Wind Farm
UnitTechnologyNameplateSummerOnlineStatus
RELOJOnshore Wind Turbine209 MW209 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 209 MW solar plant and a 209 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates