Home / Power plants / Texas / Talco Solar Project

Talco Solar Project

Solar power plant · Franklin County, Texas

Nameplate capacity
7.5 MW
Rank in Texas
#860
of 1,071 plants
In service since
2025
October 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Ellomay USA Inc
County
Franklin County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in Texas
#195 of 238
EIA plant code
69265

Generating units

Individual generating units at Talco Solar Project
UnitTechnologyNameplateSummerOnlineStatus
TALCOSolar Photovoltaic7.5 MW7.5 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Houston PlantOther7.5 MW
LampwickSolar7.5 MW
Triple Butte IBattery storage7.5 MW
GCWAOther7.2 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 7.5 MW solar plant and a 7.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates