Home / Power plants / Texas / Russek

Russek

Battery storage power plant · Reagan County, Texas

Nameplate capacity
9.9 MW
Rank in Texas
#818
of 1,071 plants
In service since
2025
January 2025

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
HEN Infrastructure, L.L.C.
County
Reagan County
Generating units
1
Share of state capacity
0.00%
Rank among battery storage plants in Texas
#195 of 211
EIA plant code
67495

Generating units

Individual generating units at Russek
UnitTechnologyNameplateSummerOnlineStatus
RUSSKBatteries9.9 MW9.9 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Regis UtopiaBattery storage9.9 MW
Rio Grande City BESS 2Battery storage9.9 MW
Saddleback BESS2Battery storage9.9 MW
SandlakeBattery storage9.9 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 9.9 MW solar plant and a 9.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates