Nameplate capacity
11 MW
Rank in Texas
#689
of 1,071 plants
In service since
2021
November 2021
Details
- Primary fuel
- Natural gas
- Technology
- Natural Gas Internal Combustion Engine
- Operator
- Generate ER-NG, LLC
- County
- Fort Bend County
- Generating units
- 28
- Share of state capacity
- 0.01%
- Rank among natural gas plants in Texas
- #166 of 310
- EIA plant code
- 66595
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| FLD10 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD11 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD12 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD13 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD14 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD15 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD16 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD17 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD18 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD19 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD20 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD21 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD22 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD23 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD24 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD25 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD26 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD27 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLD28 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLID1 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLID2 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLID3 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLID4 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLID5 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLID6 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLID7 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLID8 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
| FLID9 | Natural Gas Internal Combustion Engine | 0.4 MW | 0.4 MW | 2021 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Winmil Clean Energy Center (BESS) | Battery storage | 12 MW |
| Pantex | Wind | 12 MW |
| NASA Johnson Space Center CHP | Natural gas | 11 MW |
| State Farm Insur Support Center Central | Other | 11 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 11 MW solar plant and a 11 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates