Dogfish BESS

Battery storage power plant · Pecos County, Texas

Nameplate capacity
75 MW
Rank in Texas
#586
of 1,071 plants
In service since
2025
May 2025

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Dogfish ESS Assets, LLC
County
Pecos County
Generating units
1
Share of state capacity
0.04%
Rank among battery storage plants in Texas
#74 of 211
EIA plant code
69407

Generating units

Individual generating units at Dogfish BESS
UnitTechnologyNameplateSummerOnlineStatus
3008Batteries75 MW75 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

SenderoWind78 MW
Woodward Mountain IIWind78 MW
Corpus RefineryNatural gas75 MW
JCO Oxides Olefins PlantNatural gas74 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 75 MW solar plant and a 75 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates