Home / Power plants / Texas / Bypass BESS

Bypass BESS

Battery storage power plant · Fort Bend County, Texas

Nameplate capacity
200 MW
Rank in Texas
#316
of 1,071 plants
In service since
2026
February 2026

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Bypass BESS LLC
County
Fort Bend County
Generating units
1
Share of state capacity
0.10%
Rank among battery storage plants in Texas
#19 of 211
EIA plant code
67761

Generating units

Individual generating units at Bypass BESS
UnitTechnologyNameplateSummerOnlineStatus
1Batteries200 MW200 MW2026Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Brazoria County Solar Project (Danciger)Solar200 MW
Brazoria WestSolar200 MW
CachiBattery storage200 MW
Colbeck's Corner, LLCWind200 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 200 MW solar plant and a 200 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates