Fighting Jays Solar Project

Solar power plant · Fort Bend County, Texas

Nameplate capacity
228 MW
Rank in Texas
#259
of 1,071 plants
In service since
2022
June 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
AP Solar 2, LLC
County
Fort Bend County
Generating units
1
Share of state capacity
0.11%
Rank among solar plants in Texas
#59 of 238
EIA plant code
62945

Generating units

Individual generating units at Fighting Jays Solar Project
UnitTechnologyNameplateSummerOnlineStatus
FJSOLSolar Photovoltaic228 MW228 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Guajillo Energy StorageBattery storage229 MW
Bruennings Breeze Wind FarmWind228 MW
Patriot Wind FarmWind226 MW
Denton Energy CenterNatural gas226 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 228 MW solar plant and a 228 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates