Malakoff Solar Project
Solar power plant · Henderson County, Texas
Nameplate capacity
10 MW
Rank in Texas
#728
of 1,071 plants
In service since
2025
October 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Ellomay USA Inc
- County
- Henderson County
- Generating units
- 2
- Share of state capacity
- 0.00%
- Rank among solar plants in Texas
- #183 of 238
- EIA plant code
- 69261
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| MLKF1 | Solar Photovoltaic | 5.0 MW | 5.0 MW | 2025 | Operating |
| MLKF2 | Solar Photovoltaic | 5.0 MW | 5.0 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Leon Solar | Solar | 10 MW |
| Liggett Switch | Battery storage | 10 MW |
| Mars Solar | Solar | 10 MW |
| Matta Power Station | Battery storage | 10 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 10 MW solar plant and a 10 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates