2W Permian Solar Project Hybrid

Solar power plant · Andrews County, Texas

Nameplate capacity
460 MW
Rank in Texas
#118
of 1,071 plants
In service since
2021
August 2021

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
2W Permian Solar, LLC
County
Andrews County
Generating units
2
Share of state capacity
0.23%
Rank among solar plants in Texas
#14 of 238
EIA plant code
63255

Generating units

Individual generating units at 2W Permian Solar Project Hybrid
UnitTechnologyNameplateSummerOnlineStatus
2WPSOSolar Photovoltaic420 MW420 MW2021Operating
2WPBABatteries40 MW40 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Eastman Cogeneration FacilityNatural gas468 MW
Roadrunner, LLC HybridSolar463 MW
Texas City Power PlantNatural gas450 MW
Permian BasinNatural gas447 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 460 MW solar plant and a 460 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates