Home / Power plants / Texas / 2W Permian Solar Project Hybrid

2W Permian Solar Project Hybrid

Solar power plant · Andrews County, Texas

Nameplate capacity
460 MW
Rank in Texas
#118
of 1,095 plants
In service since
2021
August 2021

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
2W Permian Solar, LLC
County
Andrews County
Generating units
2
Share of state capacity
0.22%
Rank among solar plants in Texas
#14 of 242
EIA plant code
63255

Generating units

Individual generating units at 2W Permian Solar Project Hybrid
UnitTechnologyNameplateSummerOnlineStatus
2WPSOSolar Photovoltaic420 MW420 MW2021Operating
2WPBABatteries40 MW40 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 460 MW solar plant and a 460 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates