Pyron Wind Farm LLC Hybrid
Wind power plant · Fisher County, Texas
Nameplate capacity
259 MW
Rank in Texas
#203
of 1,071 plants
In service since
2009
February 2009
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- RWE Clean Energy
- County
- Fisher County
- Generating units
- 2
- Share of state capacity
- 0.13%
- Rank among wind plants in Texas
- #44 of 228
- EIA plant code
- 56981
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 249 MW | 249 MW | 2009 | Out of service but expected to return to service in next calendar year |
| PYRBT | Batteries | 9.9 MW | 9.9 MW | 2018 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Freeport Energy Center | Natural gas | 260 MW |
| Titan Solar Project | Solar | 260 MW |
| Wake Wind Energy Center | Wind | 257 MW |
| Roadrunner Wind Farm | Wind | 256 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 259 MW solar plant and a 259 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates