Fagus Solar Park
Solar power plant · Childress County, Texas
Nameplate capacity
332 MW
Rank in Texas
#150
of 1,071 plants
In service since
2025
December 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Excel Advantage Services, LLC
- County
- Childress County
- Generating units
- 1
- Share of state capacity
- 0.16%
- Rank among solar plants in Texas
- #22 of 238
- EIA plant code
- 67123
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| MISII | Solar Photovoltaic | 332 MW | 332 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Sage Draw Wind | Wind | 338 MW |
| TG East | Wind | 336 MW |
| Stampede Solar Hybrid | Solar | 328 MW |
| Shamrock Wind | Wind | 324 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 332 MW solar plant and a 332 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates