Old 300 Solar Center, LLC
Solar power plant · Fort Bend County, Texas
Nameplate capacity
430 MW
Rank in Texas
#123
of 1,071 plants
In service since
2024
October 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Old 300 Solar Center, LLC
- County
- Fort Bend County
- Generating units
- 1
- Share of state capacity
- 0.21%
- Rank among solar plants in Texas
- #15 of 238
- EIA plant code
- 64133
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 2222 | Solar Photovoltaic | 430 MW | 430 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Pin Oak Creek Energy Center, LLC | Natural gas | 444 MW |
| Greens Bayou | Natural gas | 432 MW |
| Ray Olinger | Natural gas | 428 MW |
| Bacliff | Natural gas | 427 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 430 MW solar plant and a 430 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates