Home / Power plants / Texas / Fort Duncan BESS

Fort Duncan BESS

Battery storage power plant · Maverick County, Texas

Nameplate capacity
103 MW
Rank in Texas
#511
of 1,071 plants
In service since
2025
June 2025

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Fort Duncan BESS, LLC
County
Maverick County
Generating units
1
Share of state capacity
0.05%
Rank among battery storage plants in Texas
#50 of 211
EIA plant code
67752

Generating units

Individual generating units at Fort Duncan BESS
UnitTechnologyNameplateSummerOnlineStatus
FTDUNBatteries103 MW103 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Alamo 6Solar105 MW
DenisonHydro104 MW
St. Gall Energy Storage IBattery storage103 MW
Victoria Texas PlantNatural gas102 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 103 MW solar plant and a 103 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates