Home / Power plants / Texas / BESS La Feria

BESS La Feria

Battery storage power plant · Cameron County, Texas

Nameplate capacity
10 MW
Rank in Texas
#704
of 1,071 plants
In service since
2026
February 2026

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Grenergy USA LLC
County
Cameron County
Generating units
1
Share of state capacity
0.00%
Rank among battery storage plants in Texas
#107 of 211
EIA plant code
69296

Generating units

Individual generating units at BESS La Feria
UnitTechnologyNameplateSummerOnlineStatus
LFBA1Batteries10 MW10 MW2026Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Aggreko MSR Grid PC7Battery storage10 MW
Alexis Solar, LLCSolar10 MW
BESS StadiumBattery storage10 MW
BESS TX Panda - BSHOU004Battery storage10 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 10 MW solar plant and a 10 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates