Callahan Divide Wind Energy Center
Wind power plant · Taylor County, Texas
Nameplate capacity
114 MW
Rank in Texas
#497
of 1,071 plants
In service since
2005
March 2005
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- FPL Energy Callahan Wind, LLC
- County
- Taylor County
- Generating units
- 1
- Share of state capacity
- 0.06%
- Rank among wind plants in Texas
- #180 of 228
- EIA plant code
- 56270
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 114 MW | 114 MW | 2005 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Bluebell Solar II | Solar | 115 MW |
| Ranchland Wind Project I | Wind | 115 MW |
| Great Plains Windpark LLC | Wind | 114 MW |
| Nacogdoches Power | Other | 114 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 114 MW solar plant and a 114 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates