Home / Power plants / Texas / Five Wells Solar Center - Hybrid

Five Wells Solar Center - Hybrid

Solar power plant · Bell County, Texas

Nameplate capacity
618 MW
Rank in Texas
#69
of 1,071 plants
In service since
2023
December 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Five Wells Solar Center, LLC
County
Bell County
Generating units
2
Share of state capacity
0.31%
Rank among solar plants in Texas
#2 of 238
EIA plant code
66420

Generating units

Individual generating units at Five Wells Solar Center - Hybrid
UnitTechnologyNameplateSummerOnlineStatus
FWSOLSolar Photovoltaic355 MW320 MW2023Operating
FWBATBatteries263 MW259 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Coleto CreekCoal622 MW
Bastrop Energy CenterNatural gas619 MW
Lost Pines 1 Power ProjectNatural gas609 MW
Topaz GeneratingNatural gas605 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 618 MW solar plant and a 618 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates