Home / Power plants / Texas / BT Signal Ranch

BT Signal Ranch

Solar power plant · Hunt County, Texas

Nameplate capacity
50 MW
Rank in Texas
#618
of 1,071 plants
In service since
2024
December 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
BT Signal Ranch, LLC
County
Hunt County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Texas
#150 of 238
EIA plant code
67849

Generating units

Individual generating units at BT Signal Ranch
UnitTechnologyNameplateSummerOnlineStatus
BTSSolar Photovoltaic50 MW50 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates