Home / Power plants / Texas / Pauline BESS

Pauline BESS

Battery storage power plant · Henderson County, Texas

Nameplate capacity
9.9 MW
Rank in Texas
#791
of 1,071 plants
In service since
2024
March 2024

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
HEN Infrastructure, L.L.C.
County
Henderson County
Generating units
1
Share of state capacity
0.00%
Rank among battery storage plants in Texas
#168 of 211
EIA plant code
66784

Generating units

Individual generating units at Pauline BESS
UnitTechnologyNameplateSummerOnlineStatus
PAULNBatteries9.9 MW9.9 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Non-PLD US-El Paso - BSSAT004Battery storage9.9 MW
OdessaBattery storage9.9 MW
PavlovBattery storage9.9 MW
Plaza StreetBattery storage9.9 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 9.9 MW solar plant and a 9.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates