Prospero Solar II
Solar power plant · Andrews County, Texas
Nameplate capacity
250 MW
Rank in Texas
#220
of 1,071 plants
In service since
2021
August 2021
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Prospero Solar II, LLC (Longroad)
- County
- Andrews County
- Generating units
- 1
- Share of state capacity
- 0.12%
- Rank among solar plants in Texas
- #45 of 238
- EIA plant code
- 64325
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PROSP | Solar Photovoltaic | 250 MW | 250 MW | 2021 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Phoebe Solar | Solar | 250 MW |
| Pisgah Ridge Solar, LLC | Solar | 250 MW |
| RE Maplewood | Solar | 250 MW |
| Roaring Springs, LLC | Solar | 250 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 250 MW solar plant and a 250 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates