Austin Gas Recovery
Other power plant · Travis County, Texas
Nameplate capacity
4.8 MW
Rank in Texas
#888
of 1,071 plants
In service since
2007
October 2007
Details
- Primary fuel
- Other
- Technology
- Landfill Gas
- Operator
- WM Renewable Energy LLC
- County
- Travis County
- Generating units
- 3
- Share of state capacity
- 0.00%
- Rank among other plants in Texas
- #36 of 47
- EIA plant code
- 56524
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GEN1 | Landfill Gas | 1.6 MW | 1.6 MW | 2007 | Operating |
| GEN2 | Landfill Gas | 1.6 MW | 1.6 MW | 2007 | Operating |
| GEN3 | Landfill Gas | 1.6 MW | 1.6 MW | 2007 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Niagara Bottling - Seguin | Solar | 4.9 MW |
| Works 4 | Other | 4.9 MW |
| PRSI FCC Generator | Other | 4.7 MW |
| BESSP1, LLC. | Solar | 4.4 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.8 MW solar plant and a 4.8 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates