Liberty County Solar Project
Solar power plant · Liberty County, Texas
Nameplate capacity
110 MW
Rank in Texas
#506
of 1,071 plants
In service since
2024
September 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Liberty County Solar Project, LLC
- County
- Liberty County
- Generating units
- 1
- Share of state capacity
- 0.05%
- Rank among solar plants in Texas
- #125 of 238
- EIA plant code
- 67159
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| LIBCO | Solar Photovoltaic | 110 MW | 100 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Keechi Wind | Wind | 110 MW |
| Los Vientos V Wind Power | Wind | 110 MW |
| Emerald Grove | Solar | 108 MW |
| Marshall Ford | Hydro | 108 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 110 MW solar plant and a 110 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates