Azure Sky Wind Project, LLC Hybrid
Wind power plant · Throckmorton County, Texas
Nameplate capacity
470 MW
Rank in Texas
#114
of 1,071 plants
In service since
2023
December 2023
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Azure Sky Wind Project, LLC
- County
- Throckmorton County
- Generating units
- 2
- Share of state capacity
- 0.23%
- Rank among wind plants in Texas
- #10 of 228
- EIA plant code
- 64164
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| ASWWT | Onshore Wind Turbine | 350 MW | 350 MW | 2024 | Operating |
| ASWBE | Batteries | 120 MW | 120 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Mustang Station Unit 4 | Natural gas | 472 MW |
| Mockingbird Solar Center | Solar | 471 MW |
| Gregory Power Plant | Natural gas | 470 MW |
| Eastman Cogeneration Facility | Natural gas | 468 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 470 MW solar plant and a 470 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates