Bluebell Solar

Solar power plant · Sterling County, Texas

Nameplate capacity
30 MW
Rank in Texas
#654
of 1,071 plants
In service since
2018
November 2018

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Bluebell Solar, LLC
County
Sterling County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in Texas
#161 of 238
EIA plant code
60789

Generating units

Individual generating units at Bluebell Solar
UnitTechnologyNameplateSummerOnlineStatus
UNIT1Solar Photovoltaic30 MW30 MW2018Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 30 MW solar plant and a 30 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates