Home / Power plants / Texas / Copperhead Solar, LLC

Copperhead Solar, LLC

Solar power plant · McLennan County, Texas

Nameplate capacity
250 MW
Rank in Texas
#211
of 1,071 plants
In service since
2024
September 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Geronimo Power
County
McLennan County
Generating units
2
Share of state capacity
0.12%
Rank among solar plants in Texas
#38 of 238
EIA plant code
67019

Generating units

Individual generating units at Copperhead Solar, LLC
UnitTechnologyNameplateSummerOnlineStatus
CHSLRSolar Photovoltaic150 MW150 MW2024Operating
CHSTGBatteries100 MW100 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 250 MW solar plant and a 250 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates