Cross Trails Energy Storage Project
Battery storage power plant · Scurry County, Texas
Nameplate capacity
58 MW
Rank in Texas
#604
of 1,071 plants
In service since
2025
May 2025
Details
- Primary fuel
- Battery storage
- Technology
- Batteries
- Operator
- Energy Vault, Inc.
- County
- Scurry County
- Generating units
- 1
- Share of state capacity
- 0.03%
- Rank among battery storage plants in Texas
- #79 of 211
- EIA plant code
- 69244
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| ESR1 | Batteries | 58 MW | 57 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Kellam Solar | Solar | 59 MW |
| Ocotillo Windpower | Wind | 59 MW |
| WestRock (TX) | Other | 58 MW |
| Bynum Solar Project | Solar | 56 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 58 MW solar plant and a 58 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates