Taygete II Energy Project
Solar power plant · Pecos County, Texas
Nameplate capacity
204 MW
Rank in Texas
#287
of 1,071 plants
In service since
2023
July 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- West Texas Solar Project II LLC
- County
- Pecos County
- Generating units
- 1
- Share of state capacity
- 0.10%
- Rank among solar plants in Texas
- #65 of 238
- EIA plant code
- 64075
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| TAYG2 | Solar Photovoltaic | 204 MW | 204 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Citadel Battery Storage Plant | Battery storage | 204 MW |
| Shannon Wind | Wind | 204 MW |
| AP Sunray LLC | Solar | 204 MW |
| Dansby | Natural gas | 203 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 204 MW solar plant and a 204 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates