Home / Power plants / Texas / Inertia Wind Project

Inertia Wind Project

Wind power plant · Haskell County, Texas

Nameplate capacity
301 MW
Rank in Texas
#169
of 1,071 plants
In service since
2023
January 2023

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Inertia Wind Project, LLC
County
Haskell County
Generating units
1
Share of state capacity
0.15%
Rank among wind plants in Texas
#25 of 228
EIA plant code
65546

Generating units

Individual generating units at Inertia Wind Project
UnitTechnologyNameplateSummerOnlineStatus
WINEROnshore Wind Turbine301 MW301 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 301 MW solar plant and a 301 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates